April 25
1:00 am



The reactor was scheduled to shut down for maintenance. While preparing for the shutdown, the operators wanted to perform a test to see how long the turbines could run the emergency cooling system if power is interrupted by an accident.

ABOVE: views of the reactor room, control room, energy meter, and an outside view of the building structure. NEXT


Source #[10]